CRM-III
Suraksha
Pathshala
SAFETY LEARNING HUB · BOKARO STEEL PLANT
Home
Safety Academy
Unit Courses
Quiz Arena
Library
Safety Bytes
Knowledge Hub
☎ Emergency
Login
← All topics
CRM-III · SAFETY QUIZ
Permit to Work & LOTO
Select a level and answer each question. You can revisit answers before submitting.
8 published questions
All
8
Foundation
4
Practical
1
Advanced
3
0 / 4 answered
Choose the best answer
QUESTION 01 / 4
Foundation
A contractor wants to resume a stopped height job the following day using yesterday’s signed checklist. What should the executing officer do?
A
Reuse the checklist if the work crew is unchanged
B
Let the workers decide after a toolbox talk
C
Start if weather appears normal
D
Reinspect and obtain the required clearance for the day before restarting
QUESTION 02 / 4
Foundation
What is the primary purpose of applying a personal lock during equipment isolation?
A
To identify the shift
B
To prevent unexpected energization during work
C
To indicate cleaning is complete
D
To speed up equipment startup
Question reference image
QUESTION 03 / 4
Foundation
A mill drive is electrically locked out, but the hydraulic accumulator remains charged. What is the correct next step?
A
Start because the motor cannot rotate
B
Release pressure by loosening the nearest fitting
C
Isolate or control all stored energy and verify the safe state under the permit
D
Ask the pulpit to keep the emergency stop pressed
QUESTION 04 / 4
Foundation
Before a contractor starts replacing a conveyor drive, what planning document is required by the contract-work safety standard?
A
A JSA/HIRA prepared in consultation with the executing authority
B
A material receipt note
C
Only a daily attendance register
D
An invoice for spare parts