CRM-III · SAFETY QUIZ
Permit to Work & LOTO
Select a level and answer each question. You can revisit answers before submitting.
8 published questions
All
8
Foundation
4
Practical
1
Advanced
3
0 / 8 answered
Choose the best answer
QUESTION 01 / 8
Advanced
During EOT crane maintenance, power has been shut down. What additional control is specified for the isolation switches?
A
Leave the switches open but unmarked
B
Lock and tag the switches with keys controlled by the maintenance group in-charge
C
Cover the switches with temporary plastic
D
Give the keys to any nearby crane operator
QUESTION 02 / 8
Advanced
Two maintenance groups work on one isolated line. What is the safer control for personal protection?
A
One lock for the whole shift without accountability
B
An approved group lockout system ensuring each worker protection
C
A verbal agreement to avoid startup
D
A warning poster alone
QUESTION 03 / 8
Practical
A machine remains moving after the main switch is opened. What should the team consider before starting work?
A
Only electrical energy
B
Stored or residual mechanical energy
C
The equipment paint colour
D
The planned production target
Question reference image
QUESTION 04 / 8
Foundation
Before a contractor starts replacing a conveyor drive, what planning document is required by the contract-work safety standard?
A
A JSA/HIRA prepared in consultation with the executing authority
B
A material receipt note
C
Only a daily attendance register
D
An invoice for spare parts
QUESTION 05 / 8
Advanced
An electrical team has isolated the drive for major mill repair. Which additional authorization is described in SG/38?
A
Verbal approval from any operator
B
A completed work permit and clearances from concerned operations and electrical areas
C
A purchase order for the repair
D
Only a production logbook entry
QUESTION 06 / 8
Foundation
What is the primary purpose of applying a personal lock during equipment isolation?
A
To identify the shift
B
To prevent unexpected energization during work
C
To indicate cleaning is complete
D
To speed up equipment startup
Question reference image
QUESTION 07 / 8
Foundation
A mill drive is electrically locked out, but the hydraulic accumulator remains charged. What is the correct next step?
A
Start because the motor cannot rotate
B
Release pressure by loosening the nearest fitting
C
Isolate or control all stored energy and verify the safe state under the permit
D
Ask the pulpit to keep the emergency stop pressed
QUESTION 08 / 8
Foundation
A contractor wants to resume a stopped height job the following day using yesterday’s signed checklist. What should the executing officer do?
A
Reuse the checklist if the work crew is unchanged
B
Let the workers decide after a toolbox talk
C
Start if weather appears normal
D
Reinspect and obtain the required clearance for the day before restarting