CRM-III · SAFETY QUIZ
Permit to Work & LOTO
Select a level and answer each question. You can revisit answers before submitting.
8 published questions
All
8
Foundation
4
Practical
1
Advanced
3
0 / 3 answered
Choose the best answer
QUESTION 01 / 3
Advanced
An electrical team has isolated the drive for major mill repair. Which additional authorization is described in SG/38?
A
Verbal approval from any operator
B
A completed work permit and clearances from concerned operations and electrical areas
C
A purchase order for the repair
D
Only a production logbook entry
QUESTION 02 / 3
Advanced
During EOT crane maintenance, power has been shut down. What additional control is specified for the isolation switches?
A
Leave the switches open but unmarked
B
Lock and tag the switches with keys controlled by the maintenance group in-charge
C
Cover the switches with temporary plastic
D
Give the keys to any nearby crane operator
QUESTION 03 / 3
Advanced
Two maintenance groups work on one isolated line. What is the safer control for personal protection?
A
One lock for the whole shift without accountability
B
An approved group lockout system ensuring each worker protection
C
A verbal agreement to avoid startup
D
A warning poster alone